Ubitricity 140 Leslie Road
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Ubitricity 140 Leslie Road?
The operator's published price is £0.56/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Ubitricity 140 Leslie Road?
Up to 5 kW AC via Type 2.
How many charging sockets does Ubitricity 140 Leslie Road have?
1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is Ubitricity 140 Leslie Road open 24/7?
Yes - Ubitricity 140 Leslie Road is open 24 hours a day, 7 days a week.
How reliable is Ubitricity 140 Leslie Road?
Amp Map measured 100% uptime here from recorded live status over the last 30 days.
Who operates Ubitricity 140 Leslie Road?
Ubitricity 140 Leslie Road is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at Ubitricity 140 Leslie Road?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity 140 Leslie Road?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ubitricity 140 Leslie Road?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.