FullVerifiedUbitricity supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 8 Oct 2026

Ubitricity 108A Larden Road, Outside 108A

108A Larden Road, Outside 108A, W3 7SX · Open 24h
Rate this charger
Network: Ubitricity
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
scit10352Type 2 · 5 kW100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
PaymentApp start/stop
6am9am12pm3pm6pm9pm
From live status history · busiest around 11pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Ubitricity 108A Larden Road, Outside 108A?

The operator's published price is £0.56/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Ubitricity 108A Larden Road, Outside 108A?

Up to 5 kW AC via Type 2.

How many charging sockets does Ubitricity 108A Larden Road, Outside 108A have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

Is Ubitricity 108A Larden Road, Outside 108A open 24/7?

Yes - Ubitricity 108A Larden Road, Outside 108A is open 24 hours a day, 7 days a week.

When is Ubitricity 108A Larden Road, Outside 108A busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 11 am. The live status on this page shows what is free before you set off.

How reliable is Ubitricity 108A Larden Road, Outside 108A?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 9 observed charging sessions.

Who operates Ubitricity 108A Larden Road, Outside 108A?

Ubitricity 108A Larden Road, Outside 108A is on the Ubitricity network.

How long does a Tesla Model Y Long Range take to charge at Ubitricity 108A Larden Road, Outside 108A?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity 108A Larden Road, Outside 108A?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Ubitricity 108A Larden Road, Outside 108A?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 5 kW Type 2~11h 4m · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 5 kW Type 2~7h 59m · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 5 kW Type 2~10h 13m · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 5 kW Type 2~10h 10m · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 5 kW Type 2~8h 32m · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 5 kW Type 2~8h 7m · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 5 kW Type 2~5h 36m · ≈ 28 kWh · ~£16