ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–07:00 | £0.45/kWh | |
| Standard | 07:00–16:00 | £0.56/kWh | |
| Peak | 16:00–20:00 | £0.67/kWh | |
| Standard | 20:00–00:00 | £0.56/kWh |
How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street?
The operator's published price is £0.45–£0.67/kWh · varies by time of day. Prices come from the operator's own data feed and can change.
How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street?
Up to 5 kW AC via Type 2.
How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street have?
1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street open 24/7?
Yes - ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street is open 24 hours a day, 7 days a week.
When is ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.
Who operates ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street?
ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 105 Lumley Street?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.