Ubitricity 1 Alexander Road, Junc. Holmesdale Road
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Ubitricity 1 Alexander Road, Junc. Holmesdale Road?
The operator's published price is £0.56/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Ubitricity 1 Alexander Road, Junc. Holmesdale Road?
Up to 5 kW AC via Type 2.
How many charging sockets does Ubitricity 1 Alexander Road, Junc. Holmesdale Road have?
1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is Ubitricity 1 Alexander Road, Junc. Holmesdale Road open 24/7?
Yes - Ubitricity 1 Alexander Road, Junc. Holmesdale Road is open 24 hours a day, 7 days a week.
When is Ubitricity 1 Alexander Road, Junc. Holmesdale Road busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 5 pm. The live status on this page shows what is free before you set off.
How reliable is Ubitricity 1 Alexander Road, Junc. Holmesdale Road?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.
Who operates Ubitricity 1 Alexander Road, Junc. Holmesdale Road?
Ubitricity 1 Alexander Road, Junc. Holmesdale Road is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at Ubitricity 1 Alexander Road, Junc. Holmesdale Road?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity 1 Alexander Road, Junc. Holmesdale Road?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ubitricity 1 Alexander Road, Junc. Holmesdale Road?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.