MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 31 Oct 2022
Toyota GB Head Office
3 Yew Tree Bottom Road, KT18 5UX
Rate this charger
Connectors
4 kW2 sockets
4 kW2 sockets
Location info
AccessPrivate · membership required
Getting thereOnly available for Toyota staff
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Toyota GB Head Office?
Up to 4 kW AC via Type 2.
How many charging sockets does Toyota GB Head Office have?
4 charging sockets: 2 × 4 kW Type 2, 2 × 4 kW Type 2.
Can anyone charge at Toyota GB Head Office?
The operator lists this charger as private - access is restricted.
How long does a Tesla Model Y Long Range take to charge at Toyota GB Head Office?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Toyota GB Head Office?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Toyota GB Head Office?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 4 kW Type 2~13h 50m
Tesla Model 3 Rear-Wheel Drive 10–80% · 4 kW Type 2~9h 59m
Audi Q4 e-tron 50 10–80% · 4 kW Type 2~12h 46m
Hyundai IONIQ 5 10–80% · 4 kW Type 2~12h 42m
MG Motor MG4 Trophy 10–80% · 4 kW Type 2~10h 40m
Hyundai Kona Electric Long Range 10–80% · 4 kW Type 2~10h 9m
Nissan LEAF 10–80% · 4 kW Type 2~7h 0m
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 31 Oct 2022