Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 13 Nov 2018

High Barnet Station NCP Car Park · Total Energies

Barnet Hill, EN5 5RP
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
J-17724 kW4 sockets
Type 27 kW4 sockets
Location info
Price£0.059/minute; min £1.18; other tariffs available. NCP daily car parking charges apply
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
NotesNCP daily parking charges apply on top of Source London fees. ANPR enforcement.
Getting there1.9m height restriction. Parking fees daily charge Mo-Fr £5.30 Sa, BHo £2 Su 1.50. Parking enforced by ANPR.
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at High Barnet Station NCP Car Park · Total Energies?

The operator's published price is £0.059/minute; min £1.18; other tariffs available. NCP daily car parking charges apply. Prices come from the operator's own data feed and can change.

How fast is charging at High Barnet Station NCP Car Park · Total Energies?

Up to 7 kW AC via J-1772, Type 2.

How many charging sockets does High Barnet Station NCP Car Park · Total Energies have?

5 charging sockets: 4 × 4 kW J-1772, 4 × 7 kW Type 2.

Who operates High Barnet Station NCP Car Park · Total Energies?

High Barnet Station NCP Car Park · Total Energies is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

How long does a Tesla Model Y Long Range take to charge at High Barnet Station NCP Car Park · Total Energies?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at High Barnet Station NCP Car Park · Total Energies?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at High Barnet Station NCP Car Park · Total Energies?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 13 Nov 2018