Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 28 Jul 2021

Roundhay Park Clocktower carpark · GeniePoint

1 Gledhow Lane, LS8 1SD
Rate this charger
Network: GeniePoint
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CHAdeMO50 kW1 socket
CEE 3 Pin50 kW1 socket
Type 222 kW1 socket
Location info
PriceFree to use until October 2021
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
NotesEngie rapid charger, 50kW DC, AC is a 22kw Socket. One bay for general use, one bay for taxis. Both Free to charge. Please register at ev.engie.co.uk
Getting thereCompletely free to use until 29th October 2021
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Roundhay Park Clocktower carpark · GeniePoint?

The operator's published price is Free to use until October 2021. Prices come from the operator's own data feed and can change.

How fast is charging at Roundhay Park Clocktower carpark · GeniePoint?

Up to 50 kW DC via CHAdeMO, CEE 3 Pin, Type 2.

How many charging sockets does Roundhay Park Clocktower carpark · GeniePoint have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CEE 3 Pin, 1 × 22 kW Type 2.

Who operates Roundhay Park Clocktower carpark · GeniePoint?

Roundhay Park Clocktower carpark · GeniePoint is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

How long does a Tesla Model Y Long Range take to charge at Roundhay Park Clocktower carpark · GeniePoint?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Roundhay Park Clocktower carpark · GeniePoint?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Roundhay Park Clocktower carpark · GeniePoint?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 28 Jul 2021