Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Oct 2020

Morrisons Great Harwood · GeniePoint

73 Queen Street, BB6 7AL
Rate this charger
Network: GeniePoint
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 222 kW1 socket
CHAdeMO50 kW1 socket
CCS50 kW1 socket
Location info
PriceRapid £1.00 fee then 30p per kWh / AC socket 50p fee then 30p per kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · pay at location
NotesGeniepoint rapid charger https://www.cpsgenie.com/ds AC is a 22 Kw Socket £10 overstay fee after 95 mins, then £10 every subsequent 95 mins. There is gates to the carpark that states they will be locked one hour after the store closes
Getting there£10 overstay fee after 95 mins, then £10 every subsequent 95 mins
Facilities
SupermarketMorrisons
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Morrisons Great Harwood · GeniePoint?

The operator's published price is Rapid £1.00 fee then 30p per kWh / AC socket 50p fee then 30p per kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Morrisons Great Harwood · GeniePoint?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

How many charging sockets does Morrisons Great Harwood · GeniePoint have?

3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

Who operates Morrisons Great Harwood · GeniePoint?

Morrisons Great Harwood · GeniePoint is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

How long does a Tesla Model Y Long Range take to charge at Morrisons Great Harwood · GeniePoint?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Great Harwood · GeniePoint?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Morrisons Great Harwood · GeniePoint?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Oct 2020