Reading, UK · Tesla
CCS / Type 2 · 130 kW100% reliability1 of 2 available
Type 2 / CCS · 130 kW100% reliability1 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–05:00 | £0.27/kWh | |
| Standard | 05:00–09:00 | £0.36/kWh | |
| Standard | 09:00–21:00 | £0.58/kWh | |
| Peak | 21:00–00:00 | £0.59/kWh |
How much does it cost to charge at Reading, UK · Tesla?
The operator's published price is £0.27–£0.59/kWh · varies by time of day. Prices come from the operator's own data feed and can change.
How fast is charging at Reading, UK · Tesla?
Up to 130 kW DC via Type 2, CCS.
How many charging sockets does Reading, UK · Tesla have?
4 charging sockets: 4 × 130 kW Type 2, 4 × 130 kW CCS. Live per-socket availability is shown on this page.
Is Reading, UK · Tesla open 24/7?
Yes - Reading, UK · Tesla is open 24 hours a day, 7 days a week.
When is Reading, UK · Tesla busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Reading, UK · Tesla?
Amp Map measured 99.8% uptime here from recorded live status over the last 30 days, across 1141 observed charging sessions.
Who operates Reading, UK · Tesla?
Reading, UK · Tesla is on the Tesla network.
How long does a Tesla Model Y Long Range take to charge at Reading, UK · Tesla?
A typical 10–80% rapid charge takes about 29 min on the 130 kW Type 2 here, adding roughly 55 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Reading, UK · Tesla?
A typical 10–80% rapid charge takes about 25 min on the 130 kW Type 2 here, adding roughly 40 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Reading, UK · Tesla?
A typical 10–80% rapid charge takes about 39 min on the 130 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.