Nottingham, UK - Loughborough Road · Tesla
CCS · 250 kW63% reliability0 of 8 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–09:00 | £0.33/kWh | |
| Peak | 09:00–00:00 | £0.61/kWh |
How much does it cost to charge at Nottingham, UK - Loughborough Road · Tesla?
The operator's published price is £0.33–£0.61/kWh · varies by time of day. Prices come from the operator's own data feed and can change.
How fast is charging at Nottingham, UK - Loughborough Road · Tesla?
Up to 250 kW DC via CCS.
How many charging sockets does Nottingham, UK - Loughborough Road · Tesla have?
8 charging sockets: 8 × 250 kW CCS. Live per-socket availability is shown on this page.
Is Nottingham, UK - Loughborough Road · Tesla open 24/7?
Yes - Nottingham, UK - Loughborough Road · Tesla is open 24 hours a day, 7 days a week.
When is Nottingham, UK - Loughborough Road · Tesla busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Nottingham, UK - Loughborough Road · Tesla?
Amp Map measured 63% uptime here from recorded live status over the last 30 days, across 1860 observed charging sessions.
Who operates Nottingham, UK - Loughborough Road · Tesla?
Nottingham, UK - Loughborough Road · Tesla is on the Tesla network.
How long does a Tesla Model Y Long Range take to charge at Nottingham, UK - Loughborough Road · Tesla?
A typical 10–80% rapid charge takes about 22 min on the 250 kW CCS here, adding roughly 55 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nottingham, UK - Loughborough Road · Tesla?
A typical 10–80% rapid charge takes about 23 min on the 250 kW CCS here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nottingham, UK - Loughborough Road · Tesla?
A typical 10–80% rapid charge takes about 39 min on the 250 kW CCS here, adding roughly 51 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.