Northampton, UK - Grange Park · Tesla
Type 2 / CCS · 150 kW100% reliability2 of 2 available
Type 2 / CCS · 130 kW99% reliability3 of 3 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–09:00 | £0.30/kWh | |
| Peak | 09:00–00:00 | £0.60/kWh |
How much does it cost to charge at Northampton, UK - Grange Park · Tesla?
The operator's published price is £0.30–£0.60/kWh · varies by time of day. Prices come from the operator's own data feed and can change.
How fast is charging at Northampton, UK - Grange Park · Tesla?
Up to 150 kW DC via Type 2, CCS.
How many charging sockets does Northampton, UK - Grange Park · Tesla have?
6 charging sockets: 2 × 150 kW Type 2, 2 × 150 kW CCS, 4 × 130 kW CCS, 4 × 130 kW Type 2. Live per-socket availability is shown on this page.
Is Northampton, UK - Grange Park · Tesla open 24/7?
Yes - Northampton, UK - Grange Park · Tesla is open 24 hours a day, 7 days a week.
When is Northampton, UK - Grange Park · Tesla busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around 8 pm. The live status on this page shows what is free before you set off.
How reliable is Northampton, UK - Grange Park · Tesla?
Amp Map measured 99.1% uptime here from recorded live status over the last 30 days, across 1948 observed charging sessions.
Who operates Northampton, UK - Grange Park · Tesla?
Northampton, UK - Grange Park · Tesla is on the Tesla network.
How long does a Tesla Model Y Long Range take to charge at Northampton, UK - Grange Park · Tesla?
A typical 10–80% rapid charge takes about 27 min on the 150 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Northampton, UK - Grange Park · Tesla?
A typical 10–80% rapid charge takes about 24 min on the 150 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Northampton, UK - Grange Park · Tesla?
A typical 10–80% rapid charge takes about 39 min on the 150 kW Type 2 here, adding roughly 51 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.