Newport Pagnell, UK - Southbound · Tesla
CCS / Type 2 · 150 kW98% reliability3 of 6 available
Type 2 / CCS · 150 kW100% reliability5 of 6 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–09:00 | £0.27/kWh | |
| Peak | 09:00–00:00 | £0.57/kWh |
How much does it cost to charge at Newport Pagnell, UK - Southbound · Tesla?
The operator's published price is £0.27–£0.57/kWh · varies by time of day. Prices come from the operator's own data feed and can change.
How fast is charging at Newport Pagnell, UK - Southbound · Tesla?
Up to 150 kW DC via Type 2, CCS.
How many charging sockets does Newport Pagnell, UK - Southbound · Tesla have?
12 charging sockets: 12 × 150 kW Type 2, 12 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Newport Pagnell, UK - Southbound · Tesla open 24/7?
Yes - Newport Pagnell, UK - Southbound · Tesla is open 24 hours a day, 7 days a week.
When is Newport Pagnell, UK - Southbound · Tesla busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Newport Pagnell, UK - Southbound · Tesla?
Amp Map measured 99.2% uptime here from recorded live status over the last 30 days, across 2836 observed charging sessions.
Who operates Newport Pagnell, UK - Southbound · Tesla?
Newport Pagnell, UK - Southbound · Tesla is on the Tesla network.
How long does a Tesla Model Y Long Range take to charge at Newport Pagnell, UK - Southbound · Tesla?
A typical 10–80% rapid charge takes about 27 min on the 150 kW Type 2 here, adding roughly 55 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newport Pagnell, UK - Southbound · Tesla?
A typical 10–80% rapid charge takes about 24 min on the 150 kW Type 2 here, adding roughly 40 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Newport Pagnell, UK - Southbound · Tesla?
A typical 10–80% rapid charge takes about 39 min on the 150 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.