London, UK - Bromley · Tesla
CCS · 250 kW100% reliability10 of 11 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–10:00 | £0.36/kWh | |
| Standard | 10:00–20:00 | £0.57/kWh | |
| Peak | 20:00–00:00 | £0.62/kWh |
How much does it cost to charge at London, UK - Bromley · Tesla?
The operator's published price is £0.36–£0.62/kWh · varies by time of day. Prices come from the operator's own data feed and can change.
How fast is charging at London, UK - Bromley · Tesla?
Up to 250 kW DC via CCS.
How many charging sockets does London, UK - Bromley · Tesla have?
11 charging sockets: 11 × 250 kW CCS. Live per-socket availability is shown on this page.
Is London, UK - Bromley · Tesla open 24/7?
Yes - London, UK - Bromley · Tesla is open 24 hours a day, 7 days a week.
When is London, UK - Bromley · Tesla busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 9 pm. The live status on this page shows what is free before you set off.
How reliable is London, UK - Bromley · Tesla?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 4012 observed charging sessions.
Who operates London, UK - Bromley · Tesla?
London, UK - Bromley · Tesla is on the Tesla network.
How long does a Tesla Model Y Long Range take to charge at London, UK - Bromley · Tesla?
A typical 10–80% rapid charge takes about 22 min on the 250 kW CCS here, adding roughly 55 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at London, UK - Bromley · Tesla?
A typical 10–80% rapid charge takes about 23 min on the 250 kW CCS here, adding roughly 40 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at London, UK - Bromley · Tesla?
A typical 10–80% rapid charge takes about 39 min on the 250 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.