Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 10 of 12VerifiedTesla supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Hilton Park, UK -  Southbound · Tesla

M6 Motorway, WV11 2AT · Open 24h
Rate this charger
Network: Tesla
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 / CCS · 150 kW100% reliability6 of 8 available
1A100% reliabilityAvailable
2A100% reliabilityAvailable
2B100% reliabilityCharging
4A100% reliabilityAvailable
4B100% reliabilityAvailable
5A100% reliabilityAvailable
6A100% reliabilityAvailable
6B100% reliabilityCharging
CCS / Type 2 · 150 kW100% reliability4 of 4 available
1B100% reliabilityAvailable
3A100% reliabilityAvailable
3B100% reliabilityAvailable
5B100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.27–£0.55/kWh · varies by time of day
Price times
RateHoursPriceCurrent
Off-peak00:00–09:00£0.27/kWh
Peak09:00–00:00£0.55/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
NoteNo charging outside opening hours
OwnerTesla, Inc.
PaymentContactlessApp start/stop
6am9am12pm3pm6pm9pm
From live status history · busiest around 1pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Hilton Park, UK -  Southbound · Tesla?

The operator's published price is £0.27–£0.55/kWh · varies by time of day. Prices come from the operator's own data feed and can change.

How fast is charging at Hilton Park, UK -  Southbound · Tesla?

Up to 150 kW DC via Type 2, CCS.

How many charging sockets does Hilton Park, UK -  Southbound · Tesla have?

12 charging sockets: 12 × 150 kW Type 2, 12 × 150 kW CCS. Live per-socket availability is shown on this page.

Is Hilton Park, UK -  Southbound · Tesla open 24/7?

Yes - Hilton Park, UK -  Southbound · Tesla is open 24 hours a day, 7 days a week.

When is Hilton Park, UK -  Southbound · Tesla busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Hilton Park, UK -  Southbound · Tesla?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 2361 observed charging sessions.

Who operates Hilton Park, UK -  Southbound · Tesla?

Hilton Park, UK -  Southbound · Tesla is on the Tesla network.

How long does a Tesla Model Y Long Range take to charge at Hilton Park, UK -  Southbound · Tesla?

A typical 10–80% rapid charge takes about 27 min on the 150 kW Type 2 here, adding roughly 55 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hilton Park, UK -  Southbound · Tesla?

A typical 10–80% rapid charge takes about 24 min on the 150 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Hilton Park, UK -  Southbound · Tesla?

A typical 10–80% rapid charge takes about 39 min on the 150 kW Type 2 here, adding roughly 51 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW Type 2~27 min · ≈ 55 kWh · ~£30
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW Type 2~24 min · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 150 kW Type 2~39 min · ≈ 51 kWh · ~£28
Hyundai IONIQ 5 10–80% · 150 kW Type 2~23 min · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 150 kW Type 2~30 min · ≈ 43 kWh · ~£23
Hyundai Kona Electric Long Range 10–80% · 150 kW Type 2~39 min · ≈ 41 kWh · ~£22
Nissan LEAF 10–80% · 150 kW Type 2~54 min · ≈ 28 kWh · ~£15

Estimates assume a typical charge curve and a warm battery.

Data: Tesla · synced 13 Oct 2026