Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 10 of 10VerifiedSource EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Stirling, Springkerse Industrial Estate · Source EV

Borrowmeadow Road, FK7 7UW · Open 24h
Rate this charger
Network: Source EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 160 kW100% reliability9 of 9 available
SGB0148-CCS1100% reliabilityAvailable
SGB0148-CCS2100% reliabilityAvailable
SGB0149-CCS1100% reliabilityAvailable
SGB0149-CCS2100% reliabilityAvailable
SGB0150-CCS1100% reliabilityAvailable
SGB0151-CCS1100% reliabilityAvailable
SGB0151-CCS2100% reliabilityAvailable
SGB0152-CCS1100% reliabilityAvailable
SGB0152-CCS2100% reliabilityAvailable
SGB0150-CHADEMO2CHAdeMO · 100 kW100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
PaymentCredit cardApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 6pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Stirling, Springkerse Industrial Estate · Source EV?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Stirling, Springkerse Industrial Estate · Source EV?

Up to 160 kW DC via CCS, CHAdeMO.

How many charging sockets does Stirling, Springkerse Industrial Estate · Source EV have?

10 charging sockets: 9 × 160 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Stirling, Springkerse Industrial Estate · Source EV open 24/7?

Yes - Stirling, Springkerse Industrial Estate · Source EV is open 24 hours a day, 7 days a week.

When is Stirling, Springkerse Industrial Estate · Source EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Stirling, Springkerse Industrial Estate · Source EV?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 180 observed charging sessions.

Who operates Stirling, Springkerse Industrial Estate · Source EV?

Stirling, Springkerse Industrial Estate · Source EV is on the Source EV network.

How long does a Tesla Model Y Long Range take to charge at Stirling, Springkerse Industrial Estate · Source EV?

A typical 10–80% rapid charge takes about 26 min on the 160 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stirling, Springkerse Industrial Estate · Source EV?

A typical 10–80% rapid charge takes about 23 min on the 160 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Stirling, Springkerse Industrial Estate · Source EV?

A typical 10–80% rapid charge takes about 39 min on the 160 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 160 kW CCS~26 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 160 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 160 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 160 kW CCS~22 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 160 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 160 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: Source EV · synced 13 Oct 2026