Stirling, Springkerse Industrial Estate · Source EV
CCS · 160 kW100% reliability9 of 9 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Stirling, Springkerse Industrial Estate · Source EV?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Stirling, Springkerse Industrial Estate · Source EV?
Up to 160 kW DC via CCS, CHAdeMO.
How many charging sockets does Stirling, Springkerse Industrial Estate · Source EV have?
10 charging sockets: 9 × 160 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Stirling, Springkerse Industrial Estate · Source EV open 24/7?
Yes - Stirling, Springkerse Industrial Estate · Source EV is open 24 hours a day, 7 days a week.
When is Stirling, Springkerse Industrial Estate · Source EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Stirling, Springkerse Industrial Estate · Source EV?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 180 observed charging sessions.
Who operates Stirling, Springkerse Industrial Estate · Source EV?
Stirling, Springkerse Industrial Estate · Source EV is on the Source EV network.
How long does a Tesla Model Y Long Range take to charge at Stirling, Springkerse Industrial Estate · Source EV?
A typical 10–80% rapid charge takes about 26 min on the 160 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stirling, Springkerse Industrial Estate · Source EV?
A typical 10–80% rapid charge takes about 23 min on the 160 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stirling, Springkerse Industrial Estate · Source EV?
A typical 10–80% rapid charge takes about 39 min on the 160 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.