Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 13 of 14VerifiedSource EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Greenock, Rue End Street · Source EV

Rue End Street, PA15 4UA · Open 24h
Rate this charger
Network: Source EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 150 kW100% reliability11 of 12 available
SGB0059-01100% reliabilityCharging
SGB0060-01100% reliabilityAvailable
SGB0061-01100% reliabilityAvailable
SGB0061-02100% reliabilityAvailable
SGB0062-01100% reliabilityAvailable
SGB0062-02100% reliabilityAvailable
SGB0063-01100% reliabilityAvailable
SGB0063-02100% reliabilityAvailable
SGB0064-01100% reliabilityAvailable
SGB0064-02100% reliabilityAvailable
SGB0065-01100% reliabilityAvailable
SGB0065-02100% reliabilityAvailable
CHAdeMO · 100 kW99% reliability2 of 2 available
SGB0059-02100% reliabilityAvailable
SGB0060-0297% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
PaymentCredit cardApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 10am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Greenock, Rue End Street · Source EV?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Greenock, Rue End Street · Source EV?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Greenock, Rue End Street · Source EV have?

14 charging sockets: 12 × 150 kW CCS, 2 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Greenock, Rue End Street · Source EV open 24/7?

Yes - Greenock, Rue End Street · Source EV is open 24 hours a day, 7 days a week.

When is Greenock, Rue End Street · Source EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is Greenock, Rue End Street · Source EV?

Amp Map measured 99.8% uptime here from recorded live status over the last 30 days, across 125 observed charging sessions.

Who operates Greenock, Rue End Street · Source EV?

Greenock, Rue End Street · Source EV is on the Source EV network.

How long does a Tesla Model Y Long Range take to charge at Greenock, Rue End Street · Source EV?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenock, Rue End Street · Source EV?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Greenock, Rue End Street · Source EV?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: Source EV · synced 13 Oct 2026