MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 7 Dec 2023
Western Way Car Park, Pembroke Dock · Silverstone Green Energy
Western Way, SA72 6JD
Rate this charger
Network: Silverstone Green Energy
Always check directly with the charge point operator for the most up-to-date information.
Connectors
120 kW1 socket
120 kW1 socket
Location info
AccessPublic
Find itStreet View of this spot ↗
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Western Way Car Park, Pembroke Dock · Silverstone Green Energy?
Up to 120 kW DC via Type 2.
How many charging sockets does Western Way Car Park, Pembroke Dock · Silverstone Green Energy have?
2 charging sockets: 1 × 120 kW Type 2, 1 × 120 kW Type 2.
Who operates Western Way Car Park, Pembroke Dock · Silverstone Green Energy?
Western Way Car Park, Pembroke Dock · Silverstone Green Energy is on the Silverstone Green Energy network.
How long does a Tesla Model Y Long Range take to charge at Western Way Car Park, Pembroke Dock · Silverstone Green Energy?
A typical 10–80% rapid charge takes about 31 min on the 120 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Western Way Car Park, Pembroke Dock · Silverstone Green Energy?
A typical 10–80% rapid charge takes about 26 min on the 120 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Western Way Car Park, Pembroke Dock · Silverstone Green Energy?
A typical 10–80% rapid charge takes about 40 min on the 120 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 120 kW Type 2~31 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 120 kW Type 2~26 min
Audi Q4 e-tron 50 10–80% · 120 kW Type 2~40 min
Hyundai IONIQ 5 10–80% · 120 kW Type 2~27 min
MG Motor MG4 Trophy 10–80% · 120 kW Type 2~32 min
Hyundai Kona Electric Long Range 10–80% · 120 kW Type 2~39 min
Nissan LEAF 10–80% · 120 kW Type 2~54 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 7 Dec 2023