Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
OfflineCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 13 Feb 2024

Rivermead Leisure Centre

Richfield Avenue, RG1 8BY
Rate this charger
Connectors
CCS150 kW2 sockets
Location info
AccessPublic
NotesStark Charge app
Facilities
Leisure
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Rivermead Leisure Centre?

Up to 150 kW DC via CCS.

How many charging sockets does Rivermead Leisure Centre have?

2 charging sockets: 2 × 150 kW CCS.

How long does a Tesla Model Y Long Range take to charge at Rivermead Leisure Centre?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rivermead Leisure Centre?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Rivermead Leisure Centre?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 13 Feb 2024