Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Jul 2023

Rewley Road 2

Rewley Road, OX1 2RA
Rate this charger
Connectors
Type 250 kW1 socket
CHAdeMO50 kW1 socket
Type 222 kW1 socket
Location info
AccessPublic
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Rewley Road 2?

Up to 50 kW DC via Type 2, CHAdeMO.

How many charging sockets does Rewley Road 2 have?

3 charging sockets: 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.

How long does a Tesla Model Y Long Range take to charge at Rewley Road 2?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rewley Road 2?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Rewley Road 2?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW Type 2~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW Type 2~50 min
Audi Q4 e-tron 50 10–80% · 50 kW Type 2~66 min
Hyundai IONIQ 5 10–80% · 50 kW Type 2~64 min
MG Motor MG4 Trophy 10–80% · 50 kW Type 2~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW Type 2~55 min
Nissan LEAF 10–80% · 50 kW Type 2~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Jul 2023