MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Feb 2020
Weybridge Business Park · Recharge (Formerly Fortum Charge & Drive)
Addlestone Road, KT15 2UP
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
22 kW7 sockets
Location info
Phone+358 20 33 4455
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Weybridge Business Park · Recharge (Formerly Fortum Charge & Drive)?
Up to 22 kW AC via Type 2.
How many charging sockets does Weybridge Business Park · Recharge (Formerly Fortum Charge & Drive) have?
7 charging sockets: 7 × 22 kW Type 2.
Who operates Weybridge Business Park · Recharge (Formerly Fortum Charge & Drive)?
Weybridge Business Park · Recharge (Formerly Fortum Charge & Drive) is on the Recharge (Formerly Fortum Charge & Drive) network. For site issues, the operator lists +358 20 33 4455.
How long does a Tesla Model Y Long Range take to charge at Weybridge Business Park · Recharge (Formerly Fortum Charge & Drive)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Weybridge Business Park · Recharge (Formerly Fortum Charge & Drive)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Weybridge Business Park · Recharge (Formerly Fortum Charge & Drive)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 16 Feb 2020