MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 11 Feb 2021
RCP Parking
Angel Street, M4 1EH
Rate this charger
Connectors
50 kW1 socket
50 kW1 socket
43 kW1 socket
Location info
AccessPublic · membership required · access key required
Phone0800 917 3208
NotesRegistration is free of charge and will ensure you will have access to future Be.EV membership benefits and offers. The sign-up process should only take a couple of minutes and our app is accessible on the chargers immediately
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at RCP Parking?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does RCP Parking have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.
How long does a Tesla Model Y Long Range take to charge at RCP Parking?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RCP Parking?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RCP Parking?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 11 Feb 2021