Ravensthorpe Retail Parks · Be.EV
Type 2 · 22 kW90% reliability2 of 2 available
CCS · 80 kW100% reliability4 of 6 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 80 kW | £0.87/kWh |
| Type 2 | 22 kW | £0.59/kWh |
How much does it cost to charge at Ravensthorpe Retail Parks · Be.EV?
The operator's published price is CCS £0.87/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Ravensthorpe Retail Parks · Be.EV?
Up to 80 kW DC via CCS, Type 2.
How many charging sockets does Ravensthorpe Retail Parks · Be.EV have?
8 charging sockets: 6 × 80 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Ravensthorpe Retail Parks · Be.EV open 24/7?
Yes - Ravensthorpe Retail Parks · Be.EV is open 24 hours a day, 7 days a week.
When is Ravensthorpe Retail Parks · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Ravensthorpe Retail Parks · Be.EV?
Amp Map measured 98.1% uptime here from recorded live status over the last 30 days, across 158 observed charging sessions.
Who operates Ravensthorpe Retail Parks · Be.EV?
Ravensthorpe Retail Parks · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Ravensthorpe Retail Parks · Be.EV?
A typical 10–80% rapid charge takes about 44 min on the 80 kW CCS here, adding roughly 55 kWh (~£48 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ravensthorpe Retail Parks · Be.EV?
A typical 10–80% rapid charge takes about 33 min on the 80 kW CCS here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ravensthorpe Retail Parks · Be.EV?
A typical 10–80% rapid charge takes about 47 min on the 80 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.