MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 30 Sept 2020
Queen Victoria Road
Queen Victoria Road, CV1 3JB
Rate this charger
Connectors
50 kW2 sockets
50 kW2 sockets
43 kW2 sockets
Location info
Price29p/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
NotesESB charger.
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Queen Victoria Road?
The operator's published price is 29p/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Queen Victoria Road?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Queen Victoria Road have?
1 charging socket: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS, 2 × 43 kW Type 2.
How long does a Tesla Model Y Long Range take to charge at Queen Victoria Road?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queen Victoria Road?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Queen Victoria Road?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 30 Sept 2020