Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 4 of 4VerifiedPOGO supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Tweedbank Retail Park · POGO

Tweedbank Retail Park, TD15 2AS
Rate this charger
Network: POGO
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 200 kW83% reliability4 of 4 available
PoGo20295100% reliabilityAvailable
PoGo20295100% reliabilityAvailable
PoGo2029766% reliabilityAvailable
PoGo2029766% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 10am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Tweedbank Retail Park · POGO?

The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Tweedbank Retail Park · POGO?

Up to 200 kW DC via CCS.

How many charging sockets does Tweedbank Retail Park · POGO have?

4 charging sockets: 4 × 200 kW CCS. Live per-socket availability is shown on this page.

When is Tweedbank Retail Park · POGO busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Tweedbank Retail Park · POGO?

Amp Map measured 91.6% uptime here from recorded live status over the last 30 days, across 200 observed charging sessions.

Who operates Tweedbank Retail Park · POGO?

Tweedbank Retail Park · POGO is on the POGO network.

How long does a Tesla Model Y Long Range take to charge at Tweedbank Retail Park · POGO?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tweedbank Retail Park · POGO?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Tweedbank Retail Park · POGO?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 200 kW CCS~23 min · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 200 kW CCS~23 min · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 200 kW CCS~39 min · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 200 kW CCS~19 min · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 200 kW CCS~30 min · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 200 kW CCS~39 min · ≈ 41 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 13 Oct 2026