Mount Pleasant Road · POGO
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Mount Pleasant Road · POGO?
The operator's published price is £0.56/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Mount Pleasant Road · POGO?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Mount Pleasant Road · POGO have?
3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2. Live per-socket availability is shown on this page.
When is Mount Pleasant Road · POGO busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Mount Pleasant Road · POGO?
Amp Map measured 97.7% uptime here from recorded live status over the last 30 days, across 113 observed charging sessions.
Who operates Mount Pleasant Road · POGO?
Mount Pleasant Road · POGO is on the POGO network.
How long does a Tesla Model Y Long Range take to charge at Mount Pleasant Road · POGO?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mount Pleasant Road · POGO?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mount Pleasant Road · POGO?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.