Goose Street · POGO
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Goose Street · POGO?
The operator's published price is £0.56/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Goose Street · POGO?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Goose Street · POGO have?
3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2. Live per-socket availability is shown on this page.
When is Goose Street · POGO busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Goose Street · POGO?
Amp Map measured 99.2% uptime here from recorded live status over the last 30 days, across 26 observed charging sessions.
Who operates Goose Street · POGO?
Goose Street · POGO is on the POGO network.
How long does a Tesla Model Y Long Range take to charge at Goose Street · POGO?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Goose Street · POGO?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Goose Street · POGO?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.