Available · 16 of 62VerifiedPod Point supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026
Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only)
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only)?
The operator's published price is £0.46/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only)?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only) have?
62 charging sockets: 62 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only)?
Amp Map measured 69.3% uptime here from recorded live status over the last 30 days, across 1133 observed charging sessions.
Who operates Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only)?
Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only) is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Warner Bros. Leavesden Park (Authorised Visitors Only)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.