Pod Point The Bell and Crown
Type 2 · 7 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point The Bell and Crown?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point The Bell and Crown?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point The Bell and Crown have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point The Bell and Crown busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 11 am. The live status on this page shows what is free before you set off.
How reliable is Pod Point The Bell and Crown?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 23 observed charging sessions.
Who operates Pod Point The Bell and Crown?
Pod Point The Bell and Crown is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point The Bell and Crown?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point The Bell and Crown?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point The Bell and Crown?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.