Pod Point Tetley Gate
Type 2 · 7 kW82% reliability4 of 4 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point Tetley Gate?
The operator's published price is £0.35/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Tetley Gate?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Tetley Gate have?
4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Tetley Gate busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 9 am. The live status on this page shows what is free before you set off.
How reliable is Pod Point Tetley Gate?
Amp Map measured 82.3% uptime here from recorded live status over the last 30 days, across 10 observed charging sessions.
Who operates Pod Point Tetley Gate?
Pod Point Tetley Gate is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Tetley Gate?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£19 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Tetley Gate?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Tetley Gate?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.