Pod Point Tesco Superstore - Fareham
Type 2 · 7 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | £0.62/kWh |
| CHAdeMO | 50 kW | £0.62/kWh |
| Type 2 | 7 kW | £0.44/kWh |
How much does it cost to charge at Pod Point Tesco Superstore - Fareham?
The operator's published price is Type 2 £0.44/kWh · CCS £0.62/kWh · CHAdeMO £0.62/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Tesco Superstore - Fareham?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Pod Point Tesco Superstore - Fareham have?
3 charging sockets: 2 × 7 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
When is Pod Point Tesco Superstore - Fareham busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point Tesco Superstore - Fareham?
Amp Map measured 96.3% uptime here from recorded live status over the last 30 days, across 76 observed charging sessions.
Who operates Pod Point Tesco Superstore - Fareham?
Pod Point Tesco Superstore - Fareham is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Tesco Superstore - Fareham?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Tesco Superstore - Fareham?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Tesco Superstore - Fareham?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.