Pod Point Tesco Extra - New Oscott (75kW)
Type 2 · 7 kW100% reliability3 of 4 available
CCS · 75 kW96% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 75 kW | £0.70/kWh |
| Type 2 | 7 kW | £0.44/kWh |
How much does it cost to charge at Pod Point Tesco Extra - New Oscott (75kW)?
The operator's published price is CCS £0.70/kWh · Type 2 £0.44/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Tesco Extra - New Oscott (75kW)?
Up to 75 kW DC via CCS, Type 2.
How many charging sockets does Pod Point Tesco Extra - New Oscott (75kW) have?
6 charging sockets: 2 × 75 kW CCS, 4 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Tesco Extra - New Oscott (75kW) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point Tesco Extra - New Oscott (75kW)?
Amp Map measured 99.2% uptime here from recorded live status over the last 30 days, across 789 observed charging sessions.
Who operates Pod Point Tesco Extra - New Oscott (75kW)?
Pod Point Tesco Extra - New Oscott (75kW) is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Tesco Extra - New Oscott (75kW)?
A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£38 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Tesco Extra - New Oscott (75kW)?
A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Tesco Extra - New Oscott (75kW)?
A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.