Pod Point Tesco Superstore - Chesterfield Clowne
Type 2 · 7 kW100% reliability1 of 2 available
Type 2 · 22 kW100% reliability1 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| Type 2 | 22 kW | £0.49/kWh |
| Type 2 | 7 kW | £0.44/kWh |
How much does it cost to charge at Pod Point Tesco Superstore - Chesterfield Clowne?
The operator's published price is Type 2 £0.44/kWh · Type 2 £0.49/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Tesco Superstore - Chesterfield Clowne?
Up to 22 kW AC via Type 2.
How many charging sockets does Pod Point Tesco Superstore - Chesterfield Clowne have?
4 charging sockets: 2 × 7 kW Type 2, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Tesco Superstore - Chesterfield Clowne busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point Tesco Superstore - Chesterfield Clowne?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 172 observed charging sessions.
Who operates Pod Point Tesco Superstore - Chesterfield Clowne?
Pod Point Tesco Superstore - Chesterfield Clowne is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Tesco Superstore - Chesterfield Clowne?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Tesco Superstore - Chesterfield Clowne?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Tesco Superstore - Chesterfield Clowne?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.