Pod Point Summerland Gate Car Park
Type 2 · 7 kW0% reliability0 of 4 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point Summerland Gate Car Park?
The operator's published price is £0.50/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Summerland Gate Car Park?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Summerland Gate Car Park have?
4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Summerland Gate Car Park busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 4 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point Summerland Gate Car Park?
Amp Map measured 18.9% uptime here from recorded live status over the last 30 days, across 54 observed charging sessions.
Who operates Pod Point Summerland Gate Car Park?
Pod Point Summerland Gate Car Park is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Summerland Gate Car Park?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Summerland Gate Car Park?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Summerland Gate Car Park?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.