Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 6 of 6VerifiedPod Point supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Pod Point St. Catherine's Leisure Park

St. Catherine's Leisure Park, PH1 5XA
Rate this charger
Network: Pod Point
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CHAdeMO · 75 kW87% reliability3 of 3 available
Amoy-Roma74% reliabilityAvailable
Lyla-Zaye94% reliabilityAvailable
Zaye-Amoy93% reliabilityAvailable
CCS · 75 kW87% reliability3 of 3 available
Amoy-Roma74% reliabilityAvailable
Lyla-Zaye94% reliabilityAvailable
Zaye-Amoy93% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.76/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
PaymentContactlessApp start/stop
Facilities
Leisure
6am9am12pm3pm6pm9pm
From live status history · busiest around 1pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Pod Point St. Catherine's Leisure Park?

The operator's published price is £0.76/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Pod Point St. Catherine's Leisure Park?

Up to 75 kW DC via CHAdeMO, CCS.

How many charging sockets does Pod Point St. Catherine's Leisure Park have?

6 charging sockets: 3 × 75 kW CHAdeMO, 3 × 75 kW CCS. Live per-socket availability is shown on this page.

When is Pod Point St. Catherine's Leisure Park busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point St. Catherine's Leisure Park?

Amp Map measured 90.3% uptime here from recorded live status over the last 30 days, across 141 observed charging sessions.

Who operates Pod Point St. Catherine's Leisure Park?

Pod Point St. Catherine's Leisure Park is on the Pod Point network.

How long does a Tesla Model Y Long Range take to charge at Pod Point St. Catherine's Leisure Park?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£42 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point St. Catherine's Leisure Park?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point St. Catherine's Leisure Park?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£42
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£30
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£38
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£32
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 75 kW CHAdeMO~54 min · ≈ 28 kWh · ~£21

Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 13 Oct 2026