Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 5 of 5VerifiedPod Point supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Pod Point Skegness NHS CDC

Old Wainfleet Road, PE25 3RR
Rate this charger
Network: Pod Point
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW100% reliability5 of 5 available
Bess-Fred100% reliabilityAvailable
Beth-Bess100% reliabilityAvailable
Greg-Matt100% reliabilityAvailable
Hugo-Reno100% reliabilityAvailable
Tess-Rich100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.40/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
PaymentApp start/stop
6am9am12pm3pm6pm9pm
From live status history · busiest around 4pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Pod Point Skegness NHS CDC?

The operator's published price is £0.40/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Pod Point Skegness NHS CDC?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Skegness NHS CDC have?

5 charging sockets: 5 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Skegness NHS CDC busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Pod Point Skegness NHS CDC?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 22 observed charging sessions.

Who operates Pod Point Skegness NHS CDC?

Pod Point Skegness NHS CDC is on the Pod Point network.

How long does a Tesla Model Y Long Range take to charge at Pod Point Skegness NHS CDC?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Skegness NHS CDC?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Skegness NHS CDC?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£22
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£16
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£20
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£20
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£17
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£16
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£11

Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 13 Oct 2026