Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 4 of 6VerifiedPod Point supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Pod Point Roys Wroxham Ltd

Stalham Road, NR12 8DB
Rate this charger
Network: Pod Point
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW100% reliability2 of 4 available
Buck-Boyd100% reliabilityUnavailable
Buck-Boyd100% reliabilityAvailable
Duke-Elle100% reliabilityCharging
Duke-Elle100% reliabilityAvailable
Ejaz-AndyCCS · 50 kW84% reliabilityAvailable
Ejaz-AndyCHAdeMO / CCS · 50 kW84% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CHAdeMO50 kW£0.62/kWh
CCS50 kW£0.62/kWh
Type 27 kW£0.44/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
PaymentContactlessApp start/stop
Getting there2 hour & overnight restrictions for parking do not apply while charging
6am9am12pm3pm6pm9pm
From live status history · busiest around 12pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Pod Point Roys Wroxham Ltd?

The operator's published price is CHAdeMO £0.62/kWh · CCS £0.62/kWh · Type 2 £0.44/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Pod Point Roys Wroxham Ltd?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

How many charging sockets does Pod Point Roys Wroxham Ltd have?

6 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS, 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Roys Wroxham Ltd busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Roys Wroxham Ltd?

Amp Map measured 96.2% uptime here from recorded live status over the last 30 days, across 243 observed charging sessions.

Who operates Pod Point Roys Wroxham Ltd?

Pod Point Roys Wroxham Ltd is on the Pod Point network.

How long does a Tesla Model Y Long Range take to charge at Pod Point Roys Wroxham Ltd?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Roys Wroxham Ltd?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Roys Wroxham Ltd?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£35
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£25
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£32
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£32
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£27
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£25
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 13 Oct 2026