Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 1 of 2VerifiedPod Point supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Pod Point Platform Building

Pitt Row, LS1 4BT
Rate this charger
Network: Pod Point
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW1 of 2 available
Lois-Jack100% reliabilityAvailable
Zack-NinaUnavailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.40/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
PaymentApp start/stop
6am9am12pm3pm6pm9pm
From live status history · busiest around 3pm
Reviews
No reviews yet - be the first to review this charger.
Amp Map flagged a possible fault · socket Zack-Nina · 210 status changes in a day and no charging sessions. This is unexpected behaviour and could be a sign of a fault.
Amp Map flagged a possible fault · socket Lois-Jack · 102 status changes in a day and no charging sessions, before it settled.
Common questions
How much does it cost to charge at Pod Point Platform Building?

The operator's published price is £0.40/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Pod Point Platform Building?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Platform Building have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Platform Building busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Pod Point Platform Building?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 32 observed charging sessions.

Who operates Pod Point Platform Building?

Pod Point Platform Building is on the Pod Point network.

How long does a Tesla Model Y Long Range take to charge at Pod Point Platform Building?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Platform Building?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Platform Building?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£22
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£16
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£20
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£20
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£17
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£16
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£11

Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 13 Oct 2026