Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 3 of 4VerifiedPod Point supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Pod Point Nene Court

Nene Court The Embankment, NN8 1LD
Rate this charger
Network: Pod Point
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 22 kW22% reliability3 of 4 available
Beck-Dion49% reliabilityAvailable
Beck-Dion49% reliabilityAvailable
Dell-Earl0% reliabilityOut of order
Dell-Earl0% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.65/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
PaymentApp start/stop
6am9am12pm3pm6pm9pm
From live status history · busiest around 10am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Pod Point Nene Court?

The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Pod Point Nene Court?

Up to 22 kW AC via Type 2.

How many charging sockets does Pod Point Nene Court have?

4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Nene Court busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Nene Court?

Amp Map measured 57.8% uptime here from recorded live status over the last 30 days, across 101 observed charging sessions.

Who operates Pod Point Nene Court?

Pod Point Nene Court is on the Pod Point network.

How long does a Tesla Model Y Long Range take to charge at Pod Point Nene Court?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Nene Court?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Nene Court?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 13 Oct 2026