Pod Point McLaren Production Centre
Type 2 · 7 kW100% reliability3 of 20 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point McLaren Production Centre?
The operator's published price is £0.25/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point McLaren Production Centre?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point McLaren Production Centre have?
20 charging sockets: 20 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point McLaren Production Centre busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point McLaren Production Centre?
Amp Map measured 99.9% uptime here from recorded live status over the last 30 days, across 390 observed charging sessions.
Who operates Pod Point McLaren Production Centre?
Pod Point McLaren Production Centre is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point McLaren Production Centre?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point McLaren Production Centre?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£10 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point McLaren Production Centre?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£13 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.