Pod Point Lavender Meadows
Type 2 · 7 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point Lavender Meadows?
The operator's published price is £0.35/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Lavender Meadows?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Lavender Meadows have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Pod Point Lavender Meadows?
Amp Map measured 100% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Lavender Meadows?
Pod Point Lavender Meadows is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Lavender Meadows?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£19 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Lavender Meadows?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Lavender Meadows?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.