Pod Point Hurst Grid Substation Site
Type 2 · 7 kW0% reliability0 of 2 available
Type 2 · 22 kW0% reliability0 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point Hurst Grid Substation Site?
The operator's published price is £0.35/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Hurst Grid Substation Site?
Up to 22 kW AC via Type 2.
How many charging sockets does Pod Point Hurst Grid Substation Site have?
4 charging sockets: 2 × 22 kW Type 2, 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Pod Point Hurst Grid Substation Site?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Hurst Grid Substation Site?
Pod Point Hurst Grid Substation Site is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Hurst Grid Substation Site?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£19 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Hurst Grid Substation Site?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Hurst Grid Substation Site?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.