Pod Point Highlands & Islands Enterprise
Type 2 · 7 kW43% reliability3 of 4 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point Highlands & Islands Enterprise?
The operator's published price is £0.46/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Highlands & Islands Enterprise?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Highlands & Islands Enterprise have?
4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Pod Point Highlands & Islands Enterprise?
Amp Map measured 42.8% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Highlands & Islands Enterprise?
Pod Point Highlands & Islands Enterprise is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Highlands & Islands Enterprise?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Highlands & Islands Enterprise?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Highlands & Islands Enterprise?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.