Pod Point Cwmbran Centre
Type 2 · 7 kW89% reliability6 of 8 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point Cwmbran Centre?
The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Cwmbran Centre?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Cwmbran Centre have?
8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Cwmbran Centre busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point Cwmbran Centre?
Amp Map measured 87.6% uptime here from recorded live status over the last 30 days, across 278 observed charging sessions.
Who operates Pod Point Cwmbran Centre?
Pod Point Cwmbran Centre is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Cwmbran Centre?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Cwmbran Centre?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Cwmbran Centre?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.