Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 1 of 2VerifiedPod Point supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Pod Point Granville Road Estate

Granville Road Estate, London Borough of Barn, NW2 2ER
Rate this charger
Network: Pod Point
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW0% reliability1 of 2 available
Enid-Dave0% reliabilityAvailable
Enid-Dave0% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
PriceFree
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
PaymentApp start/stop
6am9am12pm3pm6pm9pm
From live status history · busiest around 10am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Pod Point Granville Road Estate?

The operator's published price is Free. Prices come from the operator's own data feed and can change.

How fast is charging at Pod Point Granville Road Estate?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Granville Road Estate have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Granville Road Estate busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 4 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Granville Road Estate?

Amp Map measured 50% uptime here from recorded live status over the last 30 days.

Who operates Pod Point Granville Road Estate?

Pod Point Granville Road Estate is on the Pod Point network.

How long does a Tesla Model Y Long Range take to charge at Pod Point Granville Road Estate?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Granville Road Estate?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Granville Road Estate?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£0.00
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£0.00
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£0.00
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£0.00
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£0.00
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£0.00
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£0.00

Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 13 Oct 2026