Pod Point Gascoigne East Phase 2
Type 2 · 7 kW0% reliability0 of 10 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point Gascoigne East Phase 2?
The operator's published price is £0.40/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Gascoigne East Phase 2?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Gascoigne East Phase 2 have?
10 charging sockets: 10 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Pod Point Gascoigne East Phase 2?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Gascoigne East Phase 2?
Pod Point Gascoigne East Phase 2 is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Gascoigne East Phase 2?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Gascoigne East Phase 2?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Gascoigne East Phase 2?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.