Pod Point Cofton Country Holidays - Day Visitors Carpark
CCS · 75 kW2% reliability0 of 2 available
Type 2 · 7 kW44% reliability2 of 4 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 75 kW | £0.85/kWh |
| Type 2 | 7 kW | £0.50/kWh |
How much does it cost to charge at Pod Point Cofton Country Holidays - Day Visitors Carpark?
The operator's published price is Type 2 £0.50/kWh · CCS £0.85/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Cofton Country Holidays - Day Visitors Carpark?
Up to 75 kW DC via Type 2, CCS.
How many charging sockets does Pod Point Cofton Country Holidays - Day Visitors Carpark have?
6 charging sockets: 4 × 7 kW Type 2, 2 × 75 kW CCS. Live per-socket availability is shown on this page.
When is Pod Point Cofton Country Holidays - Day Visitors Carpark busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 7 am. The live status on this page shows what is free before you set off.
How reliable is Pod Point Cofton Country Holidays - Day Visitors Carpark?
Amp Map measured 47.3% uptime here from recorded live status over the last 30 days, across 70 observed charging sessions.
Who operates Pod Point Cofton Country Holidays - Day Visitors Carpark?
Pod Point Cofton Country Holidays - Day Visitors Carpark is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Cofton Country Holidays - Day Visitors Carpark?
A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Cofton Country Holidays - Day Visitors Carpark?
A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Cofton Country Holidays - Day Visitors Carpark?
A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.