Pod Point Co-op Petrol Filling Station
Type 2 · 7 kW0% reliability0 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point Co-op Petrol Filling Station?
The operator's published price is £0.25/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Co-op Petrol Filling Station?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Co-op Petrol Filling Station have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Pod Point Co-op Petrol Filling Station?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Co-op Petrol Filling Station?
Pod Point Co-op Petrol Filling Station is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Co-op Petrol Filling Station?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Co-op Petrol Filling Station?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£10 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Co-op Petrol Filling Station?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£13 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.