Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
OfflineVerifiedPod Point supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Pod Point Brean Leisure Park

Coast Road Brean Sands, TA8 2QY
Rate this charger
Network: Pod Point
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Josh-JohnType 2 · 3 kWUnavailable
Location info
Price£0.49/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
PaymentApp start/stop
Getting thereFor any parking restrictions that may apply, please check relevant signage. Pay and display in operation with ANPR cameras.
Facilities
Leisure
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Pod Point Brean Leisure Park?

The operator's published price is £0.49/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Pod Point Brean Leisure Park?

Up to 3 kW AC via Type 2.

How many charging sockets does Pod Point Brean Leisure Park have?

1 charging socket: 1 × 3 kW Type 2. Live per-socket availability is shown on this page.

Who operates Pod Point Brean Leisure Park?

Pod Point Brean Leisure Park is on the Pod Point network.

How long does a Tesla Model Y Long Range take to charge at Pod Point Brean Leisure Park?

A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Brean Leisure Park?

A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Brean Leisure Park?

A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 3 kW Type 2~18h 26m · ≈ 55 kWh · ~£27
Tesla Model 3 Rear-Wheel Drive 10–80% · 3 kW Type 2~13h 18m · ≈ 40 kWh · ~£20
Audi Q4 e-tron 50 10–80% · 3 kW Type 2~17h 2m · ≈ 51 kWh · ~£25
Hyundai IONIQ 5 10–80% · 3 kW Type 2~16h 56m · ≈ 51 kWh · ~£25
MG Motor MG4 Trophy 10–80% · 3 kW Type 2~14h 14m · ≈ 43 kWh · ~£21
Hyundai Kona Electric Long Range 10–80% · 3 kW Type 2~13h 32m · ≈ 41 kWh · ~£20
Nissan LEAF 10–80% · 3 kW Type 2~9h 20m · ≈ 28 kWh · ~£14

Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 13 Oct 2026