Woodlark, Bordon · Osprey Charging
CCS · 50 kW100% reliability0 of 2 available
CHAdeMO · 50 kW98% reliability0 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Woodlark, Bordon · Osprey Charging?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Woodlark, Bordon · Osprey Charging?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Woodlark, Bordon · Osprey Charging have?
6 charging sockets: 1 × 13 kW Type 2, 1 × 16 kW Type 2, 2 × 50 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Woodlark, Bordon · Osprey Charging open 24/7?
Yes - Woodlark, Bordon · Osprey Charging is open 24 hours a day, 7 days a week.
When is Woodlark, Bordon · Osprey Charging busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Woodlark, Bordon · Osprey Charging?
Amp Map measured 98.7% uptime here from recorded live status over the last 30 days, across 178 observed charging sessions.
Who operates Woodlark, Bordon · Osprey Charging?
Woodlark, Bordon · Osprey Charging is on the Osprey Charging network.
How long does a Tesla Model Y Long Range take to charge at Woodlark, Bordon · Osprey Charging?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woodlark, Bordon · Osprey Charging?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Woodlark, Bordon · Osprey Charging?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.