Willowburn Retail Park, Alnwick · Osprey Charging
CCS · 50 kW100% reliability1 of 2 available
CHAdeMO · 50 kW100% reliability1 of 2 available
Type 2 · 16 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Willowburn Retail Park, Alnwick · Osprey Charging?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Willowburn Retail Park, Alnwick · Osprey Charging?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Willowburn Retail Park, Alnwick · Osprey Charging have?
6 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 16 kW Type 2. Live per-socket availability is shown on this page.
Is Willowburn Retail Park, Alnwick · Osprey Charging open 24/7?
Yes - Willowburn Retail Park, Alnwick · Osprey Charging is open 24 hours a day, 7 days a week.
When is Willowburn Retail Park, Alnwick · Osprey Charging busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Willowburn Retail Park, Alnwick · Osprey Charging?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 613 observed charging sessions.
Who operates Willowburn Retail Park, Alnwick · Osprey Charging?
Willowburn Retail Park, Alnwick · Osprey Charging is on the Osprey Charging network.
How long does a Tesla Model Y Long Range take to charge at Willowburn Retail Park, Alnwick · Osprey Charging?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Willowburn Retail Park, Alnwick · Osprey Charging?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Willowburn Retail Park, Alnwick · Osprey Charging?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.